So after I did the lid bending. Didn’t have much time left so I worked on the handle to steer and pull it around. I will be using the tab that’s already on the tank to secure it upright. Need to drill hole in top for the pipe, add the holding tab, and close in the end. I will get that finished up and get into the FB building finally.