Hey Monty,
Thanks to everyone for the support. It hasen't been an easy ride so far but we are moving ahead. There are things beyound our control that will postpone the opening ie: replacing the exhaust vent, this has to be fabricated to fit the existing one so it matches where they have to cut out the section that can't be cleaned. Funny thing is that I've been told that it looks as though the vent hasen't been cleaned in 15 years but I have papers that say it was cleaned a year ago. I been working on the bar and have the top and front built. The top is southern yellow pine stained cherry and the front is mahogany. We rebuilt the basement walls, installed lights and finished cleaning the walk in cooler and created a dry storgae area in the basement. Plumbing inspection on Monday <crossing fingers> hopefully an electrical inspection this week also and soon after a building inspection. The kitchen is still a mess because the walls and ceiling are still open. After the inspections I'll be able to close the walls up and and finish them off with stainless steel wall panels and with luck the new vent, hood and make-up air will be installed soon. They have to get a permit and have drawings <drawings cost another 670.00> ontop of the cost on the install. We have a meeting with a new designer for the store front and sign. This is a free service from the redevelopement commity <Yeaaa something for free> and they will pay up to 3500.00 per store front remodeling and sinage, We have 2 store fronts and may get 7000.00. It's good to work with the town, It takes time but we have taken the right steps and have alot of folks behind us including the Mayor's office, the reps of the ward and the people who walk by. I left the door open last sunday and we had folks comming in asking when we are going to open. So I gave them a li'l tour of the place and happen to have a sample menu on hand .. They are excited and they think the Blues is also a good idea <we do have a house band in place> Her name is Shirley Lewis @ http://www.shirleylewis.biz/ go to contact page and she mensions "Smoken' Joe's Barbeque" She has a lot of history and awards .. so check her out. Soooo we are still trying to get the entertainment license wich souldn't be a problem just lots of red tape .. so as of now it looks like the end of May but I hope sooner and will keep everyone posted as we get closer to the opening day.
Yours in Smoken,
Joe
Thanks to everyone for the support. It hasen't been an easy ride so far but we are moving ahead. There are things beyound our control that will postpone the opening ie: replacing the exhaust vent, this has to be fabricated to fit the existing one so it matches where they have to cut out the section that can't be cleaned. Funny thing is that I've been told that it looks as though the vent hasen't been cleaned in 15 years but I have papers that say it was cleaned a year ago. I been working on the bar and have the top and front built. The top is southern yellow pine stained cherry and the front is mahogany. We rebuilt the basement walls, installed lights and finished cleaning the walk in cooler and created a dry storgae area in the basement. Plumbing inspection on Monday <crossing fingers> hopefully an electrical inspection this week also and soon after a building inspection. The kitchen is still a mess because the walls and ceiling are still open. After the inspections I'll be able to close the walls up and and finish them off with stainless steel wall panels and with luck the new vent, hood and make-up air will be installed soon. They have to get a permit and have drawings <drawings cost another 670.00> ontop of the cost on the install. We have a meeting with a new designer for the store front and sign. This is a free service from the redevelopement commity <Yeaaa something for free> and they will pay up to 3500.00 per store front remodeling and sinage, We have 2 store fronts and may get 7000.00. It's good to work with the town, It takes time but we have taken the right steps and have alot of folks behind us including the Mayor's office, the reps of the ward and the people who walk by. I left the door open last sunday and we had folks comming in asking when we are going to open. So I gave them a li'l tour of the place and happen to have a sample menu on hand .. They are excited and they think the Blues is also a good idea <we do have a house band in place> Her name is Shirley Lewis @ http://www.shirleylewis.biz/ go to contact page and she mensions "Smoken' Joe's Barbeque" She has a lot of history and awards .. so check her out. Soooo we are still trying to get the entertainment license wich souldn't be a problem just lots of red tape .. so as of now it looks like the end of May but I hope sooner and will keep everyone posted as we get closer to the opening day.
Yours in Smoken,
Joe