Past few days have been slow progress. Ran out of gas for the welder, fortunately the spool of wire finished at the same time.
As I went to put the new spool in, I noticed everything felt loose in the welder. Took off to YouTube and then a parts diagram for my welder to find out there were several parts missing or just flat out wrong for how the welder is setup.
Lesson learned, I bought this thing used and the guy I bought it from had things all screwed up. New rollers, spacers, and other parts are in place now and this thing welds like a completely different machine. Huge improvement with consistency of wire feed. Also replaced the regulator with a name brand versus the china-knockoff that it came with (dude musta kept the good one that came with the welder when he sold it). Again, huge improvement.
Got all of the C-Channel welded in place; probably way overkill... but hey, why not at this point.
Disclaimer: I'm a better grinder than a welder.
Gunna try to get as much done as I can before September, I'll be going in for some wrist surgery that'll take me out for a few weeks/a month.
To Do List:
-sausage hanger support above the top rack support
-insulate/weld top to fridge (it's just mocked up right now)
-build shelves (going to make a "fixture" on my welding bench for this to keep things consistent)
-cut sheet to enclose door
-Paint inside cabinet & door
-Paint door exterior, attach badge, hinges, latching and then weld the door enclosure on. Touch up paint from that process.
-Body work/paint the damned thing.
Felt like one heck of an accomplishment to be past the half way mark. Lot of little things to do. Hoping to get this thing done October-ish.