BGKYSmoker
Nepas OTBS #242
Original poster
Staff member
Moderator
OTBS Member
★ Lifetime Premier ★
Group Lead
Put off long enough.
Lets build.
Building the base. 48x48
4X4 Runner is cedar treated. 0 contact with inside.
Way back when I first started to work for Northrop Aircraft, I was the saw man for the heavy crating dept. We made huge crates to ship T-38, Full fuselage's, F-5, F-20 and we did some work for skunkworks,,,SHHHHHH. Great 5 years. The following 20 years were ASD & B-2 with a few other sites here and there.
I have to cut the bottom for the base. I have 3/4" mahogany ply. After its all built I'm going to fire brick the top of the ply.
To be cont.
Lets build.
Building the base. 48x48
4X4 Runner is cedar treated. 0 contact with inside.
Way back when I first started to work for Northrop Aircraft, I was the saw man for the heavy crating dept. We made huge crates to ship T-38, Full fuselage's, F-5, F-20 and we did some work for skunkworks,,,SHHHHHH. Great 5 years. The following 20 years were ASD & B-2 with a few other sites here and there.
I have to cut the bottom for the base. I have 3/4" mahogany ply. After its all built I'm going to fire brick the top of the ply.
To be cont.