Little slow on getting work done. Mainly because I bought a lot of small 3/8” plates with some plasma holes cut in them that needed to be patched. Steel was in like new condition and I would weld 4 plates together, patch holes, cut to desired dimensions. Then repeat for all sides of firebox. All in all Ingot about 3/4 a sheet of 3/8” steel for $150 instead of $1k+ it would have been. Firebox is 90% 3/8” and 10% 1/4” where I patched with round bar. Inside smoothed best I could and dont care about outside as will be insulated. Going get 5x10 sheet of 1/8” tomorrow and insulation to finish FB
fb/cc opening is cut and I added in air damper that draws from bottom like outlaw. Sits 1.5” inside FB and 1” outside.Will be 1”insulation next to inlet and 2” everywhere else. Next is making frame for door and start fabbing pieces. Will be little more difficult since I am adding window to firebox
cC has been sanded smoothed and knicks, valve holes plugged. Will continue to work on it until in condition for cerakote finish. Ton of work left but ill keep chugging along
fb/cc opening is cut and I added in air damper that draws from bottom like outlaw. Sits 1.5” inside FB and 1” outside.Will be 1”insulation next to inlet and 2” everywhere else. Next is making frame for door and start fabbing pieces. Will be little more difficult since I am adding window to firebox
cC has been sanded smoothed and knicks, valve holes plugged. Will continue to work on it until in condition for cerakote finish. Ton of work left but ill keep chugging along