A while ago i was seeking input on a comparison between OK Joe highland and WSM.
Since then i also started looking at the RF version of the Highland and decided to go for it.
I picked up a mod kit: RTV, gasket, clamps.
Will be assembling tomorrow.
New to mods so here are some dumb questions:
1. Apply RTV before assembling or after - just before tightening the screws (for: firebox joint to the CC, the two halves of the FB and the stack)?
2. How long it needs to cure (RTV)?
3. Does the self stick gasket need time cu cure after application?
4. There is a gap between the ash door and the firebox. Should i use gasket there as well?
5. Best position for clamps?
Since then i also started looking at the RF version of the Highland and decided to go for it.
I picked up a mod kit: RTV, gasket, clamps.
Will be assembling tomorrow.
New to mods so here are some dumb questions:
1. Apply RTV before assembling or after - just before tightening the screws (for: firebox joint to the CC, the two halves of the FB and the stack)?
2. How long it needs to cure (RTV)?
3. Does the self stick gasket need time cu cure after application?
4. There is a gap between the ash door and the firebox. Should i use gasket there as well?
5. Best position for clamps?