Hi all. I'm getting ready to cut out the throat opening for the firebox that has a bell mating to the cc that has a bell. My question is how do I layout the opening? Its a 100 cu in throat. If I make a template of the throat opening do I hold it vertically to the bell and trace it out or do I hold it at a 45 degree angle and trace it? If I go vertically I believe the throat would end up bigger. Does anyone have pics of a bell to bell throat opening?
Also, there is a drian smack dab in the middle of the bell, so I was thinking of raising the firebox 1 1/4" up from center of tank / above grate. Any downside to this?
Standard offset, 110 gallon build.
Hope to start a new thread this weekend with pics on the build.