Our son-in-laws will be here tomorrow to help us move furniture and appliances out of the kitchen and great room into the garage in prep for our remodeling. We have to move downstairs. I will be doing the demo work of the cabinets and flooring. Our contractor will be here 05/15. So we did a trial run to test our temporary kitchen. I converted our bar in the family room to accommodate our needs for a month or so.
Pam picked out a nice sirloin steak for kabobs, so a 4 hour marinade was in order for the beef. She chopped the veggy's while I got the grill going. Nice team effort, she got into it.
Grills hot.
On to the sear.
And my plate shot.
The beef was over cooked for me but perfect for my wife and the veggies were just awesome!
After this cook, Pam is feeling a little better about being without a kitchen for a month.
Thanks for looking guys and gals.
Pam picked out a nice sirloin steak for kabobs, so a 4 hour marinade was in order for the beef. She chopped the veggy's while I got the grill going. Nice team effort, she got into it.
Grills hot.
On to the sear.
And my plate shot.
The beef was over cooked for me but perfect for my wife and the veggies were just awesome!
After this cook, Pam is feeling a little better about being without a kitchen for a month.
Thanks for looking guys and gals.