Recent content by zsmeats

  • Some of the links on this forum allow SMF, at no cost to you, to earn a small commission when you click through and make a purchase. Let me know if you have any questions about this.
  1. zsmeats

    First time build need tips

    So last night I was working on getting the RF plate tacked in I don't wanna weld till I get some opinions This is at the FB/CC opening the tape is held against the bot of the RF plate is this to high/low? Same here tape is held against the bottom of the RF plate This is the RF plate CC...
  2. image.jpg

    image.jpg

  3. image.jpg

    image.jpg

  4. image.jpg

    image.jpg

  5. zsmeats

    First time build need tips

    So the RF plate is supposed to be mounted at the same height of the top of the CC opening correct?
  6. zsmeats

    First time build need tips

    I worked a few hours sat and a little bit Sunday and here's where' I'm at got the firebox built, CC doors welded straightened and lower rack built (no pic yet) I want to put a pipe for a RF plate drain on either the FB end or at the RF opening was wondering which way of tipping the RF plate...
  7. image.jpg

    image.jpg

  8. image.jpg

    image.jpg

  9. image.jpg

    image.jpg

  10. zsmeats

    First time build need tips

    Well the cook chamber itself is only 1/8" thick so that will probly rot out before the fire box
  11. zsmeats

    First time build need tips

    Well here's what I've gotten done so far I got the FB/CC opening cut and doors cut out and mounted I'm getting ready to build my firebox but have a couple more questions is 3/16" mild steel to thin for a firebox and what a good thickness for the RF plate
  12. image.jpg

    image.jpg

  13. image.jpg

    image.jpg

  14. zsmeats

    First time build need tips

    Well after tossing ideas around for a week I've decided to stand it up because I do want to trailer mount it
  15. First time build need tips

    First time build need tips

Clicky