So....the trailer fit into the shop. I blasted as much of the inside as I could before being blinded. Blasting in a tube is not what I call 'fun'. it is ready.
the smokestack is cut welded and in place. It will need some structural assistance because it is 1/2" wall 6" pipe (no complaints it was free). It took both of my boys to hold it up while I tacked it in place. It is almost 90* to the ground. Oops.
Here is a not so dramatic photo in the morning...
Tonight I am going to fire it up and see how the temps hold while I build the cooking grates. Due to cost there will only be three made for this event...
the smokestack is cut welded and in place. It will need some structural assistance because it is 1/2" wall 6" pipe (no complaints it was free). It took both of my boys to hold it up while I tacked it in place. It is almost 90* to the ground. Oops.
Here is a not so dramatic photo in the morning...
Tonight I am going to fire it up and see how the temps hold while I build the cooking grates. Due to cost there will only be three made for this event...