Some of the links on this forum allow SMF, at no cost to you, to earn a small commission when you click through and make a purchase. Let me know if you have any questions about this.
I need to cut my half moon opening before I put that side on. One whole side is going to be the door. So I could put the top and bottom onto one side.
trying to think of ways to cut the half moon with my angle grinder but I have a feeling it'll create too much heat and possibly warp the plate.
Argh! Went to start welding my fire box together and realized I screwed up my drawing I gave to the fab shop for the side with the vents... Was supposed to be wide and I drew it tall so the vents run up the side not across the bottom... Looks like I need to go back to the fab shop on Monday. At...
Woohoo Fire Box parts are ready! My dad is going to pick them up while I'm stuck at work. Maybe I can get an early jump on it before the weekend. He can show me how to work the welder and stuff (it's his) before he heads out of town this weekend. So pumped.
Thanks Dave, I take it I should not follow the measurements on that drawing. Not sure I could fit that much intake vent space on my little firebox... ;)
How would I figure out the dimensions/volume of the plenum? What would it be based on?
Had some time to work on it last night while my wife was at a meeting. Got the FB opening cut out. Only had to try 4 different tools and only broke 1! Haha... (was just the blade on the reciprocating saw, which was making very quick work through the straights I must say...)
This time it's...
Well it should cut easier up a bit higher... there is some pretty thick welds right in the middle there where I was cutting.
Would you recommend holding off on cutting the CC door until after the FB is welded on?
I think I've made a mistake cutting the opening for the firebox. I started cutting it at 3" from the bottom, but looking at the drawing again I think i should have cut it at 4.5" so that the top of the firebox would be at the height of the RF plate, and then cut the 3" opening in the FB.
My...
Got some more grinding done. Started cutting the opening for the fire box too. Hopefully I can get it ready for welding on the fire box tomorrow.Will be welding the fire box together next weekend I hope.
This tank has at least 1/4" thick walls...
How would you suggest filling these holes...
Made some good drawings (of the fire box) and have a fabrication shop cutting the pieces for the fire box.
Found a bit of time today (after all the honey dos) to start grinding the extra bits off the compressor tank.Won't have fire box pieces until end of next week hopefully.
before
after...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.