Search results

  • Some of the links on this forum allow SMF, at no cost to you, to earn a small commission when you click through and make a purchase. Let me know if you have any questions about this.
  1. jermbob

    firebox to CC opening for a new build

    thx for the reply Dave...so if I get the tank straight with the valves on the bottom for my drain...I then need to measure up 9" from the bottom and cut straight across from side to side for the mouth to weld the firebox into? then weld the firebox up to the tank then cut that same size hole...
  2. jermbob

    firebox to CC opening for a new build

      Starting to build a new smoker and want to make sure my figures are correct...here we go... the tank is 24" diameter x 83" long...I built a 24"x24"x24" square firebox...I have a 5 1/2" OD pipe for my chimney that says it has to be 27.89" long...I cut 2 openings in the bottom of the side of the...
Clicky