or Connect
New Posts  All Forums:Forum Nav:

1947 Kelvanator Build

post #1 of 11
Thread Starter 
[I got this fridge out of Modesto, California. Still working with surface rust that pretty much wipes off with Zep Purple. [IMG][IMG]
post #2 of 11
Thread Starter 
post #3 of 11
Thread Starter 
post #4 of 11
Thread Starter 
It's going to be pellet fired with the jen-uwine-jerry retrofit plate. I did all this work today. Hung the hopper. I drilled out all the serts and put new ones on the fridge so I could remove it if need be.
post #5 of 11
Thread Starter 
I then drilled the hole for my 5 inch stack.
post #6 of 11
Thread Starter 
post #7 of 11
Thread Starter 
post #8 of 11
Thread Starter 
I then mounted my vent for my fresh air intake . And drilled 6 1 1/4 holes.
post #9 of 11
Thread Starter 
post #10 of 11
Thread Starter 
I still need to drill the the inside for the shelf brackets. Then it tear down and add Roxul.
post #11 of 11
Thread Starter 
Quote:
Originally Posted by ferro1 View Post

[I got this fridge out of Modesto, California. Still working with surface rust that pretty much wipes off with Zep Purple. [IMG][IMG]
New Posts  All Forums:Forum Nav:
  Return Home
  Back to Forum: Fridge/Freezer Builds